June 3, 2018

Badak LNG Plant started in production in 1977. It was built initially with two trains of LNG plant, i.e: Train-A and Train-B. Each at production capacity of 460 m3/h LNG. First expansion was completed in 1983 with another two trains, i.e: Train-C and Train-D.  During t...

May 29, 2018

I begin my career as a process engineer at Badak LNG Plant, Bontang, East Kalimantan. The company gave me three month probational period. As a new process engineer, too many things that one must know and understand before they can contribute to any study. I have been a...

May 27, 2018

This is my experience which I want to share with you. I graduated in chemical engineering from Institute of Technology Bandung, Indonesia in 1983. Not long after the graduation, I was hired as a project engineer in Jakarta at a private company run by Soy Martua Pardede...

Please reload

Featured Posts

When does a space become confined?

September 25, 2018

1/4
Please reload

Recent Posts
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Contact me

Contact me for any comments or queries. Let me know your websites or blogs so I can visit you and know you better. Thank you.

​© Copyright 2023 Helfia Go Online

Visit my websites

Please visit my other websites and post your thoughts in my blogs.

  • w-facebook
  • w-tbird
  • google+