Contact me

Contact me for any comments or queries. Let me know your websites or blogs so I can visit you and know you better. Thank you.

​© Copyright 2023 Helfia Go Online

Visit my websites

Please visit my other websites and post your thoughts in my blogs.

  • w-facebook
  • w-tbird
  • google+

September 26, 2018

Microsleep is a temporary fall sleep or drowsiness which may last for a fraction of a second or up to 30 seconds where an individual fails to respond and becomes unconscious. It occurs when an individual loses awareness and subsequently gains awareness after a brief la...

September 25, 2018

Confined space is easy to recognize when it involves entry into a storage tank or pressure vessel. People would apply a systematic procedure to avoid incident. The tank or vesssel would be isolated by disconnecting or blinding the connecting lines. It then be cleaned,...

June 10, 2018

Yesterday, in a tool box talk with Maintenance team, I shared about the importance of each individuals to play their roles to pervent process safety incidents. I started with introducing the five hyrarchie of barriers in Process Safety. The best barrier (1) is called E...

June 5, 2018

In 2005 PT Badak NGL launched a mutual agreement on termination program. Those who wants to leave the company were offered with a good amount of incentives. I wanted to participate in the program, but unfortunately my application to several oil and gas companies did no...

June 3, 2018

Badak LNG Plant started in production in 1977. It was built initially with two trains of LNG plant, i.e: Train-A and Train-B. Each at production capacity of 460 m3/h LNG. First expansion was completed in 1983 with another two trains, i.e: Train-C and Train-D.  During t...

May 31, 2018

One of a process engineer role is to conduct an investigation for plant upset to find the root cause and take the lessons learn to avoid recurrence. One case the I have to handle was when Train-A experienced high CO2 breakthrough from the Acid Gas Removal Unit or CO2 A...

May 30, 2018

In 1987 - 1988 LNG Industry had been introduced with a new methodology called HAZOP to assess a new design or an existing design for any potential of hazard. HAZOP stands for Hazard and Operability. The study starts with selecting study nodes using P&ID (Process & Inst...

May 29, 2018

I begin my career as a process engineer at Badak LNG Plant, Bontang, East Kalimantan. The company gave me three month probational period. As a new process engineer, too many things that one must know and understand before they can contribute to any study. I have been a...

May 27, 2018

This is my experience which I want to share with you. I graduated in chemical engineering from Institute of Technology Bandung, Indonesia in 1983. Not long after the graduation, I was hired as a project engineer in Jakarta at a private company run by Soy Martua Pardede...

May 1, 2013

Mungkin banyak dari kita yang telah terlibat dalam industri migas tetapi belum mengetahui sejak kapan Indonesia mulai melakukan eksplorasi minyak dan gas di Indonesia.

Menurut situs web IPA (Indonesian Petroleum Association), eksplorasi minyak di Indonesia telah dimulai...

Please reload

Featured Posts

When does a space become confined?

September 25, 2018

1/4
Please reload

Recent Posts